Market Find: Another Frozen Solid White 2024 BMW M3 CS Surfaces

What: 2024 BMW M3 CS
Color: BMW Individual Frozen Solid White (non-metallic matte; P91 / YP91; BMW)
VIN: WBS63AY07RFP96082
Mileage: 2,957 Miles
Price: $137,500
Location: West Chicago, IL
Listing: Chicago Motor Cars

Just a few weeks after featuring a 2024 BMW M3 CS in Frozen Solid White, another has surfaced for sale. Our previous example showed 4,553 miles and carried a $138,000 asking price, making the arrival of another low-mileage car in the same relatively unusual specification worth noting. 

This time the car is at Chicago Motor Cars with just 2,957 miles and an asking price of $137,500. BMW Individual Frozen Solid White was a $4,500 option when new, and once again it works especially well against the exposed carbon fiber throughout the CS, along with the Matte Gold Style 827M wheels and red exterior accents.

The M3 CS was more than a trim package on a regular G80 M3. BMW based it on the M3 Competition xDrive, increasing output from the twin-turbocharged 3.0-liter S58 inline-six to 543 hp while retaining 479 lb-ft of torque. It also received additional chassis bracing, CS-specific suspension, steering and stability-control calibration, along with extensive use of carbon-fiber-reinforced plastic for the hood, front splitter, front air intakes, mirror caps, rear diffuser and rear spoiler. BMW quoted a roughly 75-pound weight reduction compared with the M3 Competition xDrive.

Inside, this example carries Full Merino Anthracite leather with M Carbon bucket seats, carbon fiber trim and the familiar red CS accents. Its window sticker also confirms M Drive Professional, the M front strut brace, M Sport Differential, Adaptive M Suspension, M Carbon Exterior Package, Shadowline exterior trim, Anthracite headliner, Harman Kardon audio, M Driver’s Package and the Alcantara steering wheel. Unlike the previous Frozen Solid White car we featured, this example does not have the optional M Carbon ceramic brakes and instead uses the standard M Compound brakes with red calipers.

The original sticker is also interesting from a market perspective. This car carried a base MSRP of $118,700, with Frozen Solid White adding $4,500 and destination another $995, bringing total suggested retail price to $124,195. At today’s $137,500 asking price, it is still being offered more than $13,000 above its original sticker despite now showing just under 3,000 miles.

Seeing one Frozen Solid White M3 CS come onto the market caught our attention. Seeing another appear almost immediately afterward makes us wonder how many more are hiding out there. For anyone who missed the first one, apparently there is already another chance.